Search Results
W024 Turn Semi Trailer Assembling Platform Sequence To The Submerged Arc Welding Platform
W025 Adjusting Operation Panel Of Submerged Arc Welding Platform To Start Merge The Main Beam
W026 Submerged Arc Welding One Side Of Semi Trailer Main Beam Under The Protection Of Flux
W029 Welding Ramps For Lift And Right Side Wall Of The Rear Tipping Semi Trailer
W027 Finishing Submerged Arc Welding One Side Of The Semi Trailer Main Beam
W033 Tack Wedding The Steel Floor Plate To Rear Dumping Semi Trailer Chassis Frame Top
S002 (Speed) Semi Trailer Main Beam Top Bottom Flange And Web Assembling Platform Observation
F001 Factory Tour First Video To Show How Our Yard Looks Like Where We Are Locating In
M052 Submerged Arc Welding Position Of The Semi Trailer
W028 Remove The Protection Flux After Submerged Arc Welding One Side Finished
S006 (Speed) Checking Repairing Semi Trailer Main Beam After The Submerged Arc Welding Observation
S008 (Speed) Cold Straightening Semi Trailer Main Beam Top Bottom Flange And Web Observation